CRUXUpstream OS
← All skills
Workflow Component
Registry: previewQuality lift unmeasuredadvanced

Sensitivity & stress battery

Can we produce an internal IC workpaper that identifies the largest one-at-a-time development-value driver, compares two consistently prepared economic scenarios, and reports a separate deterministic leverage/RBL stress without conflating those lenses or overstating runtime capability? Trigger phrases: sensitivity stress battery, sensitivity & stress battery. Produces: cited sensitivity & stress battery workpaper and decision flags.

Reserves And Subsurface · Underwriting · v1

Measured quality evidence

Quality lift unmeasured

Registry maturity does not prove response or artifact quality. No qualifying same-model skill-on versus no-skill improvement has been verified.

Required comparison: same model with this skill enabled versus the same model without the skill.

Inputs and output

Required inputs

  • Artifact Control Register
  • Base Ebitda USD
  • Base Net Debt USD
  • Base Pdp PV-10 USD
  • Battery Basis Review
  • Benchmark ID
  • Capex Per Well USD
  • Covenant Leverage X
  • Currency
  • Deal ID
  • Discount Rate
  • Hedge Pct
  • Hh
  • Liquids Weight Pct
  • Model
  • NRI
  • Ownership Basis
  • Price Deck
  • Production Period
  • RBL Advance Rate Pct
  • Reserve Report
  • Scenario A
  • Scenario B
  • Shock
  • Source Documents
  • Source Spans
  • Swing Pct
  • Unit Basis
  • Valuation Date
  • Well Count
  • Wells Per Month
  • WI
  • Wti

Optional inputs

  • Basin
  • Battery Packet Markdown
  • Deal Name
  • Hedge Review

Required source documents

  • Model
  • Price Deck
  • Reserve Report
  • Credit Agreement
  • Hedge Book

Expected outputs

  • Sensitivity Stress Packet

Buyer-profile access

Policy visibility is not execution proof. Authentication is checked before a run.

Available

Read-only connection

The skill entry point is callable. Any downstream write or external action is checked separately.

Available

Partner workspace

The skill entry point is callable. Any downstream write or external action is checked separately.

External-action review

Review review applies before a consequential external or binding action. Analysis and working artifacts remain available before that review.

No specific external-action review item is declared.

Input gaps and limits

Dependent input gaps

  • Battery Packet Markdown is missing or unverified: The dependent calculation remains open. CRUX returns the other supported work and names the exact input needed.

Known limitations

  • Preview capability: useful but incomplete eval or SME coverage; human review required.
  • Do not use to read or rebuild an uploaded model, recut reserves or a price deck, compute the two scenario cases, build a corporate/equity SOTP, set a bid, prove liquidity survival, estimate probability of breach, determine a lender borrowing base, or interpret a credit agreement. Use reserve-case-ingest or pv10-nav-sotp for reserve/NAV work; downside-stress-survive for a distinct survival/distribution review; rbl-borrowing-base-packet for facility sizing; and hedge-covenant-cockpit for owned-book hedge/covenant monitoring.

Relationships

Workflow-registry jobs

No workflow relationship is declared.

Use this skill

Sign in to use CRUX

Authentication and the required buyer profile are checked before any work runs.

Sensitivity & stress battery · CRUX Catalog