CRUXUpstream OS
← All skills
Workflow Component
Registry: previewQuality lift unmeasuredadvanced

Vertical-integration evaluation

Can we normalize a dated development-plan and cost-basis scenario, execute the deterministic rig/frac/SWD/mineral screen, isolate what the engine calculated from what it omits, and produce an internal decision workpaper that prevents a positive combined screen from being mistaken for a feasible or approval-ready build-vs-buy recommendation? Trigger phrases: vertical integration eval, vertical-integration evaluation. Produces: cited vertical-integration evaluation workpaper and decision flags.

Acquisition Underwriting · Underwriting · v1

Measured quality evidence

Quality lift unmeasured

Registry maturity does not prove response or artifact quality. No qualifying same-model skill-on versus no-skill improvement has been verified.

Required comparison: same model with this skill enabled versus the same model without the skill.

Inputs and output

Required inputs

  • Acreage Total Acres
  • Acres Per Well
  • AFE
  • Baseline Dc Per Well USD
  • Cost Basis Review
  • Currency
  • Deal ID
  • Discount Rate
  • Drilling Days Per Well
  • Economics Model
  • Evaluation Scope
  • Feasibility Constraints
  • Frac Internal Per Stage USD
  • Frac Spread Purchase Price USD
  • Frac Stages Per Well
  • Frac Third Party Per Stage USD
  • Mineral Case Review
  • Own Drilling Rigs
  • Own Frac Spreads
  • Own Swd Network
  • Pct Acreage With Owned Minerals
  • Reporting Period
  • Rig Daily Internal Cost USD
  • Rig Daily Third Party Rate USD
  • Rig Purchase Price USD
  • Rig Utilization Pct
  • Royalty Rate Captured
  • Source Documents
  • Source Spans
  • Swd Buildout Capex USD
  • Swd Internal Per Bbl USD
  • Swd Third Party Per Bbl USD
  • Unit Basis
  • Vi Hold Years
  • Water Per Well Bbl
  • Well Life Revenue USD
  • Wells Per Year

Optional inputs

  • Basin
  • Deal Name
  • Vi Markdown

Required source documents

  • AFE
  • Economics Model
  • Model
  • Title

Expected outputs

  • Vertical Integration Evaluation

Buyer-profile access

Policy visibility is not execution proof. Authentication is checked before a run.

Available

Read-only connection

The skill entry point is callable. Any downstream write or external action is checked separately.

Available

Partner workspace

The skill entry point is callable. Any downstream write or external action is checked separately.

External-action review

Review review applies before a consequential external or binding action. Analysis and working artifacts remain available before that review.

Review item

This is review guidance for a later external or binding action. Supported analysis and a working artifact remain available with the review item attached.

Applies before: binding action, external release

Review item

This is review guidance for a later external or binding action. Supported analysis and a working artifact remain available with the review item attached.

Applies before: binding action, external release

Input gaps and limits

Dependent input gaps

  • Vi Markdown is missing or unverified: The dependent calculation remains open. CRUX returns the other supported work and names the exact input needed.

Known limitations

  • Preview capability: useful but incomplete eval or SME coverage; human review required.
  • Do not use for automated breakeven activity, mineral acquisition valuation, full life-cycle capex approval, vendor contracting, tax/financing, regulatory feasibility, or a water-only build-vs-buy; use water-midstream-eval for the latter.

Relationships

Workflow-registry jobs

No workflow relationship is declared.

Use this skill

Sign in to use CRUX

Authentication and the required buyer profile are checked before any work runs.

Vertical-integration evaluation · CRUX Catalog